3rd to 10th Oct 2015
After leaving Stephen and Jodie and Hamilton Island we anchored at Funnel Bay, the next day we decided with the weather report of 20 to 25 knot winds, we would go into the marina until it blows over. The plan was to get to Mackay Marina, do some work on the boat and get her ready for a long stay there and cyclones. Now that we have to stay here we are doing the work now then when there is a break we would head to Mackay then.
The following job list is what we got done at Abell Point:
- Solar Panel cables - Seal
- White goop on the last solar panel to seal it up
- Window Seal - fix port forward window leak
- Engine oil change
- Engines - de-rust and spray
- Polish stainless
- Buy new dock lines and splice one end and whip the other end
- Tighten seat bolt
The following job list is what we still have to do when we get to Mackay:
- Wipe down all cabin walls and ceilings
- Lift all bedding up and open storage lids.
- Lock cabin hatches
- Remove sails and store inside
- Remove all shade cloth, cloths line, cushions, life ring and any loose lines and store inside
- Lock outside forward lockers
- Tie down BBQ lid
- Clean and empty fridge & freezer of any perishable food
- Remove dry food from cupboard & place in a crate and store in a cabin
- Close all blinds inside or put up cloth
- Empty dinghy and check lines
- Check all lines are secure
- Buy a dehumidifier and turn on before we leave for airport.
On top of that Martin had to do paperwork for the job in Canberra we are going home for and I had to catch up on the blog, those 2 are done mostly.
While in Abell Point Marina we did have time to meet up with some friends, some boatie some not.