This is the channel that I needed to get through before crossing the bar.
As it turns out there was still about 2 knots of current going out of the lake. Not unmanageable but still more than I would of liked. Anyway, timed the run to the bridge to perfection and we went straight through. Concentrating on getting through the channel.
And the bridge we’re about to go through with a green light for me.
Uneventful crossing of the bar and a very pleasant 3 hour motor sail up the coast and we get to Newcastle. And then to finish off a very good day we get welcomed into Newcastle harbour by these guys.
(Wasn't that nice, a whole post with nothing about engines )
No comments:
Post a Comment